7% Off Any Prefab Garage Through Feb. 15!
Terms and Conditions
- Garage drawings must be purchased prior to February 15, 2023. (Drawings are $400; this $400 will be credited toward the final building price.)
- Building details must be finalized and a deposit placed within 30 days of receiving the completed drawings. (If engineered drawings are required by local regulations, the time needed to obtain engineered drawings will not be counted against the 30 days.)